NTI · Boiler troubleshooting
Functional test after maintenance
What is going on
Last job before handing the TRX150 back. Fill, purge, power up, check.
Likely causes
- Air left in the CH or DHW circuits
- System pressure below the fill target
- Exhaust pipe loose, or a gas joint missed after service
Check in this order
- Fill and purge the CH circuit to 12 psi and fill and purge the DHW circuit.
- Power the boiler on.
- Purge air again from the CH and DHW circuits if needed.
- Check boiler and system settings and components, and confirm all adjustments work.
- Confirm the exhaust pipe is connected properly.
- Reinstall the boiler front cover.
- Check for gas leaks.
- Set the maintenance interval if needed.
Applies to: TRX150
More boiler guides
Related
NTI error codes · NTI parts · NTI tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: NTI TRX150 manual, p. 100. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.