Viessmann · Boiler troubleshooting

Frame mounting and levelling the boiler

Vitodens 200-W B2HB

What is going on

Free-standing installation on the boiler stand or frame. The wall location for the frame, bracket and vents is not supplied and must be calculated in the field. The boiler must sit level both ways so condensate drains properly.

Check in this order

  1. Secure the boiler stand to the floor. Concrete expansion anchors are specified as Hilti KB-TZ (size illegible in source) or equivalent.
  2. Fasten the wall mounting bracket to the boiler mounting frame using the supplied hardware and make sure the bracket is level.
  3. Move the frame into position and secure it to the floor, and to the wall if needed.
  4. Remove the external accessories connection box cover.
  5. Loosen (do not remove) the screws at the bottom of the boiler.
  6. Remove the front enclosure panel by lifting it up and pulling it away from the boiler.
  7. Mount the boiler onto the mounting bracket and make sure it is secure. Install the holding bracket to the frame on top of the boiler.
  8. Adjust the levelling screws until the boiler is level.
  9. Connect the boiler to the installation fittings.

Applies to: Vitodens 200-W B2HB 45, 57, 160, 199

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitodens 200-W B2HB installation manual, p. 16-17. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.