Flue system conditions before commissioning
What is going on
Commissioning may only start when the flue and air supply conditions are met.
Check in this order
- Confirm unrestricted flow in the flue gas routes.
- Confirm the positive pressure flue system is gas-tight.
- Check inspection port covers are secure and tight.
- Confirm combustion air openings are open and cannot be closed.
- Confirm all local flue and commissioning regulations are followed.
- Fit the coaxial vent seal if the boiler is direct vent on a two-pipe system.
- Vents for combustion air must be non-closable and wind protected to stop condensate draining.
Applies to: Vitodens 100-W B1HE/B1KE flue system
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 100-W, B1HE/B1KE Installation/Service, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.