Fitting the programming unit at the top
What is going on
Procedure when the programming unit is mounted at the top; see page 16 for the mounting panel.
Check in this order
- Install the mounting panel for the programming unit at the top.
- Reconnect the plugs to the mounting panel on the right. Do not change where and how the cable is secured (cable tie fixing point).
- Pull Lightguide A out of all 4 detents at once and remove it, pulling it upwards between 2 detents in the middle. Take care not to break the locking tabs.
- Turn Lightguide A around and clip it into place at the bottom of the programming unit.
- Fit the front panel and check it is seated correctly; it also seals the air box.
- Fit the programming unit with Lightguide A at the bottom.
Applies to: Vitodens 100-W B1HE/B1KE
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 100-W B1HE/B1KE installation manual, p. 31. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.