Viessmann · Boiler troubleshooting
Filling the heating system
What is going on
Fill and vent the heating system with the expansion vessel and fill pressure set correctly.
Check in this order
- With the system cold, check the expansion vessel pre-charge.
- If pre-charge is below static pressure, top up with nitrogen until it is 1.5 to 3 psi (0.1 to 0.2 bar) above static pressure.
- Close the gas shutoff valve.
- Open any installed shutoff valves.
- Fill the system with water through the boiler drain/fill valve and vent it.
- Fill until the fill pressure is 1.5 to 3 psi (0.1 to 0.2 bar) above the expansion vessel pre-charge.
- Mark the set pressure on the gauge.
- Return shutoff valves to operating position.
- Close the drain/fill valve.
Applies to: Vitocrossal 300 CU3A start-up
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 300 CU3A service instructions, p. 10. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.