Field wiring requirements
What is going on
Wiring must meet the national and local electrical codes listed for the installation.
Check in this order
- Follow the National Electrical Code (ANSI/NFPA 70) or CSA C22.1 in Canada, plus any local codes.
- Use N.E.C. Class 1 wiring.
- If the original boiler wire is replaced, use 105°C wire or equivalent.
- Use 14 ga. or heavier for supply wiring and additional control wiring.
- Provide an electrical ground at the boiler as the codes require.
- Disconnect power, including the boiler service switch, before installing or servicing.
Applies to: Vitorond 100 VR1 22 to 33, 91 to 140
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100, VR1 Installation and Service Instructions, p. 33. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.