NTI · Boiler troubleshooting
Exhaust vent and intake pipe installation rules
What is going on
General rules for routing and joining vent pipe.
Check in this order
- Use only solid PVC, CPVC or stainless pipe, or polypropylene approved for Category IV. ABS is for air inlet only.
- Remove all burrs and debris from joints.
- Clean, prime and cement all PVC/CPVC joints with approved cement (ASTM D2564 for PVC, ASTM F493 for CPVC). Do not cement polypropylene.
- Slope horizontal exhaust back toward the boiler at least 1/4 in per foot.
- Support all piping. Use hangers at 4 ft intervals or less.
- Do not use the boiler to support any piping.
- Install roof flashing where pipe passes the roof.
- Keep the exhaust discharge pointing away from the roof pitch.
- Screen both terminations to keep out debris and birds.
- Do not vent over walkways, driveways or parking lots where condensate could freeze in cold climates.
Applies to: Exhaust vent and intake pipe
More boiler guides
Related
NTI error codes · NTI parts · NTI tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: NTI TRX150 manual, p. 36-37. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.