Electrical installation checklist
What is going on
Electrical work must follow local codes and be done by a qualified electrician.
Check in this order
- Ground the boiler per the National Electrical Code or local code.
- Power the heating elements from a 240 VAC single phase supply.
- Run a separate 120 VAC, 15 A circuit for the circulating pump and keep it separate from thermostat and low voltage wires.
- Tighten all connections with a 3/16 in. hex key.
- Check every electrical connection is tight before starting the boiler.
- Use copper wire only and size breakers and conductors from the nameplate.
Applies to: Vitotron 100 VLN2 electrical
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotron 100 VLN2 installation and service instructions, p. 10-11. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.