Direct vent sidewall termination height
What is going on
Vent termination must be at least 12 in (305 mm) above the anticipated snow level and placed so snow cannot block it. The termination must be installed with proper clearances per local codes or CAN/CSA-B149.1 or NFPA 54. Exposed PP(s) pipe and elbows outside must be UV resistant.
Likely causes
- Snow blocking the termination
Check in this order
- Set the sidewall termination at least 12 in (305 mm) above the anticipated snow level.
- Confirm the termination cannot be blocked by snow.
- Use UV resistant polypropylene for exposed PP(s) pipe and elbows.
- Install a stainless steel or plastic mesh screen on the intake terminal.
- Follow the vent maker's instructions for the sidewall kit.
Applies to: Direct vent sidewall termination
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CI2 Installation Instructions, p. 56. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.