Viessmann · Boiler troubleshooting

Connect several remote controls and BUS participants via a terminal box (version 2)

Vitocontrol-S VD2/CT3/CM2

What is going on

Use an on-site terminal box when several remote controls and additional KM BUS participants are connected.

Check in this order

  1. Install a terminal box on site.
  2. Connect the control unit, remote controls and other BUS participants as shown in the diagram.
  3. Keep each branch within 15 m / 50 ft.
  4. Keep the total KM BUS cable length within 50 m / 164 ft.

Applies to: Vitotrol remote controls and additional KM BUS participants

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocontrol-S VD2/CT3/CM2 installation and service instructions, p. 151. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.