Viessmann · Boiler troubleshooting
Connect flue gas and combustion air
What is going on
Connect the flue and combustion air pipes with the shortest practical run and secure them. The boiler flue collector cannot carry the venting weight.
Check in this order
- Fit an on-site support immediately downstream of the boiler flue connection.
- Connect the flue outlet to the flue pipe with the shortest run, with a slight rise (minimum 3 degrees), and avoid sharp bends.
- Use the flue and combustion air sizes listed in the setting table for this section.
- Use a CPVC adaptor (80 mm to 3 in.) where the venting requires it.
- Secure combustion and exhaust pipes with the venting manufacturer's anchoring accessories.
- Follow the CU3A venting instructions for configurations and limits.
- Keep all pipework free of load and torque stress.
Applies to: Vitocrossal 300 CU3A 26 to 199
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 300 CU3A 26 to 199 installation instructions, p. 21. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.