Viessmann · Boiler troubleshooting
Connect combustion air blower through common interface
What is going on
Wire the shared blower on a multiple boiler system.
Check in this order
- Disconnect power to the control and burner.
- Wire the blower motor (120 VAC, 5 FLA max.) to the common combustion air device interface.
- Wire the proving switch (120 VAC rated) and the 120 VAC supply as shown.
- Provide disconnect means and overcurrent protection as local codes require.
- Select the blower fuse using the blower manual's current rating.
Applies to: Multiple boiler system, shared blower
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 100 GC1 / 300-K MW1S installation, p. 43. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.