Viessmann · Boiler troubleshooting
Connect boiler activation contact (plug aVH, terminals 2 and 3)
What is going on
Dry contact that controls preheat, isolation valve and modulation on external modulation setups.
Check in this order
- Disconnect power before wiring.
- Connect a dry contact to terminals 2 and 3 of plug aVH.
- With contact closed, preheat runs first for follow-up boilers (coding 2b). After preheat, minimum temperature holds and burner stages or modulation can be switched externally. Setpoint is chosen by coding 9b.
- With contact open, the isolation valve closes after about 5 minutes (coding 2C). External override of burner stages is not possible and no minimum temperature is held.
- On multi-boiler systems the lead boiler contact must be constantly closed.
Applies to: VD2/VD2A and CT3 with external modulation controller
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Viessmann Vitotronic 300 GW2 installation and service instructions, p. 41, 43. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.