What is going on

Drain must use a P-trap or siphon, be inspectable, and terminate in an open or vented drain close to the boiler. A condensate pump is needed if the boiler outlet is lower than the drain.

Check in this order

  1. Install the condensate drain pipe with a suitable slope.
  2. Use 1 in diameter discharge tubing of CPVC, PVC or another code-approved material.
  3. Use pipe and fittings meeting ASTM D1785 or D2846 (CPVC or PVC cement and primer to ASTM D2564 or F493). In Canada use CSA or ULC listed schedule 40 CPVC or PVC.
  4. If the boiler condensate outlet is lower than the drain, install a condensate pump approved for condensing boilers, with an overflow switch.
  5. If the boiler sits even with the ground, install the condensate drain above ground by max 2 in (50 mm).
  6. Vent the pipe between the siphon trap and the neutralization unit if one is used.
  7. Do not connect other appliance drains, such as a water softener backwash, to the boiler condensate drain.

Applies to: Condensate drain

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocrossal 300 CA3B Dual Fuel Series 2.5 to 6.0 installation instructions, p. 40. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.