Viessmann · Boiler troubleshooting

Combustion air supply requirements

Vitorond 200VD2A

What is going on

Combustion and ventilation air must be sufficient at all times, and the boiler room must never be under negative pressure.

Likely causes

  • Exhaust, attic or dryer fans that pull air out faster than it can enter the building.

Check in this order

  1. Provide combustion and ventilation air per local codes; without local codes use CAN/CSA-B149.1 or .2 (Canada) or ANSI Z223.1 section 5.3 (US).
  2. For oil installations use CSA B139 (Canada) or NFPA 31 (US).
  3. Locate the boiler near an outside wall where fresh air can be ducted directly to it, and size ducts per national codes.
  4. Never cover the boiler, block the combustion air opening, or put anything inside the draft hood.
  5. Keep chemicals such as bleach, hair spray and degreasers out of the boiler room.
  6. Tell the system owner about these air requirements.

Applies to: Vitorond 200 VD2A installations

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitorond 200 VD2A installation manual, p. 34. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.