Viessmann · Boiler troubleshooting
Close the combustion chamber door after service
What is going on
Reassemble the chamber and make sure the door seals.
Check in this order
- Put the flue gas turbulators back in.
- Refit the combustion chamber insert if one was removed.
- Close the combustion chamber door and tighten the two bolts evenly.
- Install the front panel.
- Fasten the burner hood if fitted and lock it in place.
- Reconnect the oil burner and follow the burner installation and start-up manual.
- Confirm no tools are left inside the combustion chamber.
Applies to: VR1 40 to 63, 161 to 245
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100 installation and service manual, p. 49. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.