Viessmann · Boiler troubleshooting
Checking static and supply pressure
What is going on
Measure gas static pressure and running (supply) pressure at the test nipple. Do not adjust the inlet pressure switch; it is factory set to 4 in. w.c.
Check in this order
- Close the gas shut-off valve.
- Undo the screw inside test nipple A. Do not remove it.
- Connect the pressure tester at test nipple A.
- Open the gas shut-off valve.
- Check the static pressure (maximum 14 in. w.c.).
- Record the value in the Maintenance Record.
- Start the burner at maximum output using the emissions test switch.
- Measure the supply pressure with a gauge that resolves at least 0.04 in. w.c.
- Record the value in the report.
- Close the gas shut-off valve.
- Remove the pressure tester and close test nipple A.
Applies to: Vitocrossal 200 CM2 186 to 311 boilers
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CM2 186 to 311 Service Instructions, pp. 14-15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.