Viessmann · Boiler troubleshooting
Check vent termination clearances before commissioning
What is going on
Confirm the vent termination meets height and spacing limits from the manual.
Check in this order
- Measure the vent termination height above grade and the anticipated snow level.
- Confirm it is at least 12 in above snow level.
- On sloped or flat roofs, confirm the vent height and obstruction clearances.
- Confirm the total equivalent length (exhaust plus intake) does not exceed 198 ft (60 m).
- Add elbow equivalent lengths to the total before checking the limit.
Applies to: Vitocrossal 200 CI2 direct and single-pipe venting
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CI2 Installation manual, p. 56, 58, 59. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.