Viessmann · Boiler troubleshooting
Check static gas pressure
What is going on
Confirm the static gas pressure at the inlet test connector. Maximum is 14 in w.c.
Check in this order
- Close the gas shut-off valve.
- Loosen the screw in test connector A without removing it.
- Connect the pressure gauge to test connector A.
- Open the gas shut-off valve.
- Check that static pressure is no more than 14 in w.c.
- Record the reading on the maintenance record (page 95).
- Check all connections for gas tightness with soap and water.
Applies to: Vitocrossal 200 CI2 399 to 2000 MBH
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CI2 service instructions, p. 23. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.