Beckett · Boiler troubleshooting
CF375 annual service checklist
What is going on
Yearly service items for the CF375 burner.
Check in this order
- Change the oil line filter and clean or replace the pump strainer (new cover gasket/O-ring).
- Check supply line fittings for leaks; lines should be free of water and sludge.
- Fit the nozzle the boiler maker specifies.
- Clean and check electrodes; replace cracked ones or ones with rounded tips. Check electrode settings.
- Clean igniter contacts and the cad cell lens. Check gaskets, head and air tube for carbon.
- Clean the blower wheel, air inlet, housing and static plate.
- Motor amps must not be above the nameplate. Check wiring.
- Check pump pressure and cutoff, and primary control lockout timing.
- Clean flue passages and vent, then set combustion with instruments and record the results.
Applies to: Beckett CF375
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Beckett CF375 Burner Manual (Weil-McLain WGO/WTGO/SGO sizes 8-9, 0125), Perform regular maintenance, p.15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.