Viessmann · Boiler troubleshooting
Burner motor power supply, 3-phase 208, 460 or 575 V
What is going on
Power the burner motor from a 3-phase supply. The motor rotation must be checked during commissioning.
Check in this order
- Disconnect power to the burner and the boiler control.
- Connect 3-phase power to terminals 21, 22, 23 and 24 on the DIN rail in the connection enclosure. Fit a fuseable disconnect according to local codes.
- Connect the supplied power cable to the motor terminals on the burner.
- Plug the cable plug into the socket on the DIN rail in the connection enclosure.
- During commissioning, check the motor rotation against the direction shown on the burner.
- If the motor turns the wrong way, disconnect power and reverse wires BK1 and BK2 on the burner terminals.
Applies to: Burners with 3PH 208, 460 or 575 V supply
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 100 GC1 / Vitotronic 300-K MW1S installation and service instructions, p. 52. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.