What is going on

Power the burner motor from a 3-phase supply. The motor rotation must be checked during commissioning.

Check in this order

  1. Disconnect power to the burner and the boiler control.
  2. Connect 3-phase power to terminals 21, 22, 23 and 24 on the DIN rail in the connection enclosure. Fit a fuseable disconnect according to local codes.
  3. Connect the supplied power cable to the motor terminals on the burner.
  4. Plug the cable plug into the socket on the DIN rail in the connection enclosure.
  5. During commissioning, check the motor rotation against the direction shown on the burner.
  6. If the motor turns the wrong way, disconnect power and reverse wires BK1 and BK2 on the burner terminals.

Applies to: Burners with 3PH 208, 460 or 575 V supply

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitotronic 100 GC1 / Vitotronic 300-K MW1S installation and service instructions, p. 52. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.