Viessmann · Boiler troubleshooting
Burner heat demand wiring
What is going on
Terminals 29 and 30 call for heat from stage 1. Terminals 32 and 33 call for stage 2 of a 2-stage boiler, or the second boiler in a lead-lag setup. Both are potential-free contacts, usually wired to the TT contacts on the boiler. Staging depends on control settings.
Check in this order
- Wire single-stage boilers with 2-conductor cable.
- Wire 2-stage boilers with 4-conductor cable.
- Confirm the terminal locations and requirements in the boiler manual or control manual.
Applies to: Versatronik 200 burner demand outputs
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 200 installation manual, p. 15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.