Viessmann · Boiler troubleshooting

AUX heat demand input wiring

Versatronik 300 Cascade Control

What is going on

The AUX input takes a potential-free dry contact. Closing the contact requests heat at a fixed set point. It can be used with outdoor reset or on its own as an enable/disable.

Check in this order

  1. Wire the BMS or mechanical control through a field-supplied relay to the AUX terminals.
  2. Use an AC or DC relay coil with the correct control voltage. The contact closure is the heat demand.
  3. Use low-voltage wiring and keep it away from 120/240 VAC conductors.
  4. Set the demand set point as described in the coding steps.

Applies to: AUX terminals, heat demand

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Versatronik 300 Cascade Control technical, installation and configuration manual, p. 11. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.