Assembling the boiler base
What is going on
Steps to set up the base and crossbar before fitting the cast iron sections.
Check in this order
- Install the levelling bolts and set them to their lowest position.
- Level the boiler base with the levelling bolts.
- Screw in the bolts or anti-vibration bolts. Levelling foot B is only used on sizes 230 and 270.
- Install crossbar A with its larger cut-out facing the front of the boiler.
- Use a level to confirm the base is level.
- Support the cast iron sections with field-supplied support A before assembly to prevent tipping.
- Place the cast iron leg section firmly on the base and shim if needed.
- Cross bar larger cut-out moves to its end during cast assembly.
- After assembling the cast iron sections, re-level the boiler with the levelling bolts.
Applies to: Vitorond 200 VD2A
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 200 VD2A installation instructions, pp. 13-15. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.