ICP sequences of operation

3 sequences for ICP equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.

Heat pump (3)

Heating

Cooling

Defrost

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.