Goodman-Amana-Daikin · Air conditioner · Cooling
Cooling call with blower board delays
What happens, in order
- Thermostat energizes G and Y; 24 V reaches Y at the condensing unit and G on the EBTDR blower board
- Compressor and condenser fan start
- 7 s later the EBTDR relay closes and the blower starts
- Thermostat satisfied G and Y drop
- Compressor and condenser fan stop; the blower stops after the 65 s delay-off
Timings and thresholds
| Item | Value |
|---|---|
| Blower on delay | 7 s |
| Blower off delay | 65 s |
Applies to: Goodman ASX / GSX / DSX air conditioners with MBR / AR*F air handlers
Models
More Goodman-Amana-Daikin air conditioner sequences
- Communicating low and high stage cooling · Cooling
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Goodman R-410A ASX/GSX/DSX A-C and ASZ/GSZ/DSZ HP service RS6200006, Sequence of Operation 1.0. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.