Trane · General troubleshooting
Delete a schedule period
What is going on
Remove an unwanted period from the XL1050 schedule.
Check in this order
- From the Schedule screen, select DELETE PERIOD.
- Press the trash can icon on each period to remove.
- Select APPLY to save and return to the Schedule screen.
- Confirm the change shows on the display.
Applies to: XL1050 schedule
More general guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Trane ComfortLink II XL1050 user guide 32-5093-04B-EN, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.