Viessmann · Air handler troubleshooting

Electrical parts removal (control box and boards)

Vitocal IND-A

What is going on

Disassembly of the electrical control box, main control board, data transfer board and transformer. Anti-static gloves must be worn.

Check in this order

  1. Turn off all power before starting.
  2. Remove the 2 screws of the upper cover plate assembly, then remove the cover.
  3. Remove 2 screws, then unplug the plugs.
  4. Pull out the electric control box subassembly.
  5. Remove the 2 screws and the 1 ground screw.
  6. Unplug the plugs, then remove the main control board subassembly.
  7. Release the data transfer module control board screw (1) and remove the board.
  8. Release the 2 screws, then remove the transformer.

Applies to: DLFUAA indoor air handler (Vitocal IND-A)

More air handler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: DLFUAA service manual, p. 35-36. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.