What happens, in order

  1. Complete the cable connections and DIP switch settings first.
  2. Power on; each FND1 display shows the master set-up.
  3. Hold SW3 and SW4 on slave 1 together for more than 3 seconds; its FND1 changes to S001.
  4. Repeat for slave 2.
  5. Hold SW3 and SW4 on the master together for more than 3 seconds; all FND displays change to the setting temperature.

Timings and thresholds

ItemValue
Hold SW3 and SW4 on each slave to start slave set-upmore than 3 seconds
Hold SW3 and SW4 on master to finish set-upmore than 3 seconds

Applies to: Cascade systems

Models

CRCC

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: CR-CC installation manual, p. 37. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.