Lennox · General
System Under Test System Under Test after power interruption
What the display is showing
The thermostat is searching for the indoor and outdoor controls after a power interruption. The outdoor control can take longer to boot and may not answer right away.
Applies to: S40 Smart Thermostat
Good to know
- Power interruption to the system
What to do
- Wait for the outdoor control to finish booting.
- Cycle power to the system if the message does not clear.
Other codes on the same units
- Ambient lockout Ambient lockout notice
- Defrosting Outdoor unit defrost in progress
- Load shedding, wait time 45 min Utility load shedding with 45 minute wait
- Peak Monitoring until x:xx pm - x:xx pm Peak Monitoring energy savings period
- Service Urgent Service Urgent alert on Home screen
- Will start soon Will start soon delay
Save it for the next call
Star this code in the HVACopedia app and keep the whole library on your phone for jobs with no signal.
Source: Lennox S40 Smart Thermostat User Guide, p. 21. Summarized in our own words; check the original manual for your model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.