Glow Brand · technician tips
Glow Brand service menus, test modes and resets
59 tips for boiler: access codes, button combinations, test modes and the resets you need at the appliance.
Jump to: Access & passwords (2) · Button combinations (3) · Service & test modes (3) · Reset & cancel (4) · Settings shortcuts (2) · Commissioning (21) · Other (24)
Access & passwords
Installer and service menu codes, and how to get into them.
Button combinations
Key presses that open menus, show readouts or switch modes.
Front panel button functions for editing
Boiler · Glow Combi C95 & C140
The four-button console is used the same way in the user, information and installer menus.
- RESET/ENTER opens the main menu, selects a parameter, and saves a changed value.
- DHW up and DHW down move through menus and change a flashing value.
- CH up or CH down exits the menu or cancels an edit without saving.
- Press CH up or CH down twice to exit the Information Menu.
Applies to: All C95 and C140 units
Source: C95 & C140 Installation & Operation Manual, p. 56-57. Written in our own words; check the manual for your exact model.
Service & test modes
Forced fan, low and high fire, test and diagnostic modes, error history and live data.
Display test
Boiler · Glow Combi C95 & C140
Lights every LCD segment so a faulty display can be checked.
- Open the User Menu and select parameter 0.997.
- Confirm and watch that all LCD segments light up.
- Press any button to quit.
Applies to: All C95 and C140 units
Source: C95 & C140 Installation & Operation Manual, p. 56. Written in our own words; check the manual for your exact model.
Run the system test (fixed fan / low / ignition / high fire)
Boiler · Glow B85/B120/B160
Parameter 0.200 appears in the user menu only after the installer code has been entered. Used for combustion setup; the boiler locks in CH mode so a heat load must be available. It times out on its own.
- Enter the installer code in CodE, leave the installer menu and open the user menu (0.000).
- Select 0.200. The main screen shows tESt alternating with the active test.
- Step through tests with CH up/down or DHW up/down: OFF, FAN (fixed fan speed), Lo (minimum power), Ign (ignition power), Hi (maximum power), REg (maximum power limited by supply temperature), Stb (max thermostat test), LCO1 (low water cut-off test).
- For combustion analysis pick Hi, wait 5 minutes, measure CO2/CO at the 1/2 in. test port in the exhaust adapter, then check Lo as well.
Applies to: B85, B120, B160 (NG and LP)
Source: Glow Brand B85/B120/B160 Installation & Operation Manual V20231025, 11.10 p.60; 10.2.2 p.48. Written in our own words; check the manual for your exact model.
Reset & cancel
Clearing lockouts, service reminders and fault history; skipping purge or de-air programs.
Cancel the 14-minute de-air sequence
Boiler · Glow B85/B120/B160
On every power-up (parameter 2.139 = 1) the control runs a 14-minute de-air cycle (dAir) and ignores calls. If the system is already purged you can skip it.
- Hold CH down and DHW down together for at least 3 seconds while dAir shows.
- To change when it runs: 2.139 = 0 runs it every 24 h, 1 after every power cycle (default), 2 disables it.
Applies to: B85, B120, B160 (NG and LP)
Source: Glow Brand B85/B120/B160 Installation & Operation Manual V20231025, 11.10 p.60; 11.6 p.57. Written in our own words; check the manual for your exact model.
Clear a lockout
Boiler · Glow B85/B120/B160
Hard lockouts (Loc) are not cleared by cycling power.
- Hold RESET/ENTER for at least 2 seconds on the display.
- For software lockouts also press the small reset button on the back of the ICB.
- Too many resets in a row triggers Err 134; then cycle power and fix the real cause.
Applies to: B85, B120, B160 (NG and LP)
Source: Glow Brand B85/B120/B160 Installation & Operation Manual V20231025, 12.1 p.61; 12.2 p.65. Written in our own words; check the manual for your exact model.
Reset the service reminder
Boiler · Glow Combi C95 & C140
A wrench icon appears every 365 days as a service reminder. It is cleared through the installer menu.
- Enter the Installer Menu.
- Go to parameter 2.203.
- Change the value to RESET and save it with RESET/ENTER.
Applies to: All C95 and C140 units
Source: C95 & C140 Installation & Operation Manual, p. 61. Written in our own words; check the manual for your exact model.
Reset the service reminder (wrench icon)
Boiler · Glow B85/B120/B160
A blinking wrench means the service interval has elapsed.
- In the installer menu open 2.203 and choose Reset (the parameter can also be switched On/Off).
- 2.204 sets the interval in days (30-1275, default 1000).
Applies to: B85, B120, B160 (NG and LP)
Source: Glow Brand B85/B120/B160 Installation & Operation Manual V20231025, Table 11.6 p.57. Written in our own words; check the manual for your exact model.
Settings shortcuts
Where the useful parameters live and what they are set to from the factory.
Change display units and run the display test
Boiler · Glow B85/B120/B160
User-level settings, no code needed.
- 0.901 = temperature unit C/F, 0.902 = pressure unit bar/psi.
- 0.997 lights every LCD segment; press any button to leave.
Applies to: B85, B120, B160 (NG and LP)
Source: Glow Brand B85/B120/B160 Installation & Operation Manual V20231025, Table 11.4 p.52. Written in our own words; check the manual for your exact model.
Flue temperature sensor limit
Boiler · C95 & C140
Default flue limit is 149°F (65°C) for PVC venting. Installer may raise it to 194°F (90°C) for higher CH temperatures, but then parameters must be updated and S636 CPVC venting must be used.
- Leave the flue limit at 149°F (65°C) for PVC venting.
- To go higher, set the new limit in the parameters, and use S636 CPVC vent per Section 4.5.1.
Applies to: Flue sensor setting
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 41. Written in our own words; check the manual for your exact model.
Commissioning
Start-up and set-up steps that are easy to miss.
Air removal from the system
Boiler · Glow Combi
The boiler's two automatic air vents only purge the boiler itself. They do not clear the system plumbing. Additional air vents and bleeders must be placed around the system, ideally higher up and in areas with guaranteed positive pressure, such as near the fill point and expansion tank.
- Install air vents and bleeders across the system, not just at the boiler.
- Place air removal devices high in the system and near the fill and expansion tank.
- Do not install flow checks, motorized valves, or shutoff devices between the closely spaced tees and the expansion tank, except for servicing.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, pp. 34-35. Written in our own words; check the manual for your exact model.
Altitude rating of the boiler
Boiler · C95 & C140
The unit ships set for 0 to 4,500 ft. Use the sea-level input rate for installs from 0 to 2,000 ft. Above 4,500 ft the factory must be contacted for a high-altitude setup.
- Confirm the install altitude before setting the input rate.
- Use the sea-level input rate for 0 to 2,000 ft.
- Contact the manufacturer for installs above 4,500 ft.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 3. Written in our own words; check the manual for your exact model.
Boiler sizing for the heating system
Boiler · C95 & C140
Size the boiler with an accepted method. Use the AHRI I=B=R Guide for convection radiation. Use the radiant tubing maker's guidance for new radiant systems. If an indirect water heater is used, the boiler must meet that heater maker's output requirement.
- For baseboard or radiators, size with the I=B=R Guide RHH.
- For new radiant systems, use the tubing manufacturer's boiler sizing guide.
- With an indirect water heater, confirm the boiler output meets the heater manufacturer's requirement.
- Check that maximum combustion air and exhaust pipe lengths in Section 4 are not exceeded.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 3. Written in our own words; check the manual for your exact model.
Check combustion above 2000 ft
Boiler · C95 & C140 Combi
Above 2000 ft the boiler's combustion must be checked with a calibrated combustion analyzer. The installer is responsible for checking and adjusting combustion for safe operation.
- Use a calibrated combustion analyzer at elevations above 2000 ft.
- Adjust combustion as the manual directs, then record the results.
- The manual points to Section 9.0 for this adjustment, which does not match the section list; confirm the correct procedure in the gas valve setup section.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 10. Written in our own words; check the manual for your exact model.
Combi boiler commissioning checklist
Boiler · C95 & C140
Work through this checklist on the commissioning sheet before handing the boiler over. Record readings and the procedure results, then sign and date the sheet.
- Confirm hydro, gas and water are available at the appliance before starting.
- Confirm the unit matches the work order and that model and serial numbers are recorded.
- Check that there is no flammable material or liquid near the appliance.
- Keep a minimum 24 in. clearance in front of the appliance.
- Check voltage and polarity.
- Check that all gas and water connections are tight and leak free.
- Check gas pressure at the appliance and record it.
- Check CO2 against the installation manual values and record it.
- Record the CO reading in ppm.
- Check that the venting meets the installation manual and local codes.
- Check that the condensate trap is primed and not blocked.
- Check that the drain tube and condensate hose are installed correctly.
- Check that both automatic air vents are open.
- Bleed air from the heating loop or recirculation line if fitted.
- Burp the circulation pump inside the combi.
- Confirm parameters are set to suit the appliance.
- Check that the safety components work as intended.
- Check that the pressure relief valve is installed correctly and operating.
- Leave the installation manual with the appliance.
- Enter the contractor, technician and homeowner details, sign the sheet and record the date.
Applies to: C95 & C140 combi boiler commissioning
Source: Glow Brand C-300 C95-C140 installation & operation manual, p. 97. Written in our own words; check the manual for your exact model.
Confirm gas type before startup
Boiler · C95 & C140 Combi
The boiler leaves the factory set for one gas type shown on the rating plate. It cannot be converted to another gas, and no natural gas to LP conversion kit is available.
- Check that the gas type on site matches the rating plate.
- Do not attempt a natural gas to LP conversion, since no kit exists.
- Use the wrong gas and the burner can run dangerously.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 9. Written in our own words; check the manual for your exact model.
DHW flow and capacity limits
Boiler · C95 & C140
Instantaneous DHW has no storage. Output temperature falls off as flow rises past the boiler's heating capacity. A storage tank can be added for large draws.
- Confirm the flow rate at the fixture stays within the boiler's heating capacity.
- Use the combination inlet screen and flow restrictor cartridge; do not run without the screen.
- Use a DHW storage tank per the schematic in Section 7.3 when large draws are needed.
Applies to: Instantaneous DHW
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 40-42. Written in our own words; check the manual for your exact model.
DHW flow limiter and pressure drop
Boiler · C95 & C140 Combi
Each model ships with a DHW flow limiter, and the pressure drop vs. flow curves show its effect. The curve values are not readable on the printed page.
- C95: use the 2.4 gpm flow limiter and check against the C95 DHW pressure drop curve.
- C140: use the 4.0 gpm flow limiter and check against the C140 DHW pressure drop curve.
- To reach higher DHW flow, change the flow restrictor (see section 14.7).
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 14. Written in our own words; check the manual for your exact model.
Gas supply and piping cautions
Boiler · C95 & C140
Keep piping stress off the gas valve, use a sediment trap on vertical runs, and use a manual shut-off upstream of any flexible connector.
- Use a manual gas shut-off valve upstream of the flexible connector.
- Support piping so no load is put on the internal gas valve.
- Install a sediment trap at the inlet to the boiler if the gas line runs vertically.
- Use thread compound that resists natural gas, applied from two threads back from the end.
- Do not purge gas through the boiler's internal fittings; loosen only the line connections outside the unit.
Applies to: Gas piping
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 43-44. Written in our own words; check the manual for your exact model.
Gas type cannot be changed in the field
Boiler · C95 & C140
The boiler is factory set for the gas type on the rating plate and must not be converted to another gas.
- Check the rating plate gas type before installation.
- Do not convert the boiler to a different gas.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 3. Written in our own words; check the manual for your exact model.
Head available for the heating loop (worked example)
Boiler · C95 & C140 Combi
Use the pump curve and heat exchanger pressure drop to find the head left for the field piping and heating devices, using a 5 gpm target flow on the C95.
- Read the pump head at the target flow. Example: 25.5 ft at 5 gpm (Fig. 2.3).
- Read the heat exchanger pressure drop at the same flow. Example: 4.4 psi (10.2 ft) at 5 gpm (Fig. 2.4).
- Subtract the pressure drop from the pump head. Example: 25.5 - 10.2 = 15.3 ft left for piping and heating devices.
- On the C140, the factory low loss header is supplied for field installation, so the field-supplied secondary CH pump provides the external head.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 13. Written in our own words; check the manual for your exact model.
Leak check the vent on first startup
Boiler · C95, C140
All exhaust venting connections must be checked for leaks with soap solution at first startup. Repair any leak before running the unit.
- Apply soap solution to every exhaust vent connection at startup.
- Repair any leak before continuing operation.
Applies to: C95 and C140 at commissioning
Source: Glow Brand C95 & C140 installation & operating manual, p. 19. Written in our own words; check the manual for your exact model.
Leak testing and gas pressure test cautions
Boiler · C95 & C140
Isolate the boiler from the gas line for any test at 1/2 PSI (14 in. w.c.) or more, and never use an open flame to find leaks.
- Close the boiler's individual manual shut-off valve during supply system pressure tests at or below 1/2 PSI.
- Disconnect or isolate the boiler if the test pressure will be higher than 1/2 PSI.
- Use a gas leak detector or soapy water on all fittings and retighten any bubbling connections.
Applies to: Gas piping
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 43-44. Written in our own words; check the manual for your exact model.
Minimum flow and overheating risk
Boiler · Glow Combi
The low mass heat exchanger needs a minimum water flow whenever the burner is on. Too little flow lowers efficiency and can cause overheating, premature failure, and void the warranty. Running with insufficient water level also causes overheating.
- Confirm the minimum flow rate through the boiler whenever the burner runs.
- Do not run the boiler without sufficient water level.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 34. Written in our own words; check the manual for your exact model.
Pressure relief assembly and low loss header
Boiler · Glow Combi
The C95 comes with a pressure relief assembly that needs 3 inches of clearance from gas and piping. The C140 must use the factory low loss header. The header is optional for the C95. Without it, a primary/secondary tee arrangement is needed to keep minimum flow (not required on C95).
- Keep 3 inches of clearance from gas and piping around the relief assembly.
- On C140, install the low loss header. Do not omit it.
- On C95, the low loss header is optional; use primary/secondary tees if it is not fitted.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, pp. 34-35. Written in our own words; check the manual for your exact model.
Pressure relief valve installation
Boiler · Glow Combi
The relief valve must be vertical at the boiler outlet, on the CH return fitting. Its drain must exit horizontally from the side and elbow down. Pipe the discharge to a location where steam or water will not cause damage or injury.
- Mount the relief valve vertically at the boiler outlet.
- Point the drain outlet sideways, then elbow it down.
- Pipe the discharge to a safe location.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, pp. 33-34. Written in our own words; check the manual for your exact model.
Prime the condensate trap before startup
Boiler · C95 & C140
The trap must hold water before the boiler starts, or flue gases can enter the building.
- Remove the flue gas inlet plug (T).
- Fill the trap (S) about three quarters full with water.
- Replace the flue gas inlet plug (T).
- Check the trap is secure and not under strain.
Applies to: Condensate trap priming
Source: Glow Brand C95 & C140 installation & operating manual, p. 31. Written in our own words; check the manual for your exact model.
Set DHW temperature low to limit scald risk
Boiler · C95 & C140 Combi
Set the domestic hot water to the lowest temperature that still meets the user's needs. The manual recommends 120°F/49°C, which lowers scald risk and also improves efficiency and reduces scale.
- Set the DHW temperature to 120°F/49°C or lower where possible.
- Fit a tempering (mixing) valve in the domestic hot water supply to cut point-of-use temperature.
- Keep DHW at or below 140°F/60°C. The manual says the warranty is void above this setting.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 8. Written in our own words; check the manual for your exact model.
Set the appliance type for CPVC / high temperature venting
Boiler · Glow B85/B120/B160
Factory setting limits flue temperature to 149 F for PVC. For CH or DHW setpoints above 140 F the vent must be CPVC and the control must be told.
- Set 2.138 to 52 (B85/B120 NG), 53 (B160) or 55 (B85/B120 LP) for a 194 F flue limit; 50, 51 and 54 are the PVC defaults.
- Raise 2.024 (max CH setpoint) and 2.003, and for DHW 2.091 and 2.115, to the required values up to 180 F.
- Exceeding what the vent allows gives Loc 16.
Applies to: B85, B120, B160 (NG and LP)
Source: Glow Brand B85/B120/B160 Installation & Operation Manual V20231025, Table 11.7 p.59; 4.5.2 p.17. Written in our own words; check the manual for your exact model.
Verify carbon monoxide alarm before operation
Boiler · C95 & C140 Combi
The installer must confirm that at least one carbon monoxide alarm is installed in the living space before the appliance is put into operation.
- Confirm a CO alarm is installed in the residential living space.
- Install the alarm per the alarm maker's instructions and local code before energizing the boiler.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 9. Written in our own words; check the manual for your exact model.
Water hardness and DHW cleaning
Boiler · C95 & C140
Water above 50 ppm calcium carbonate must be softened. Brazed plate DHW exchanger can be acid cleaned if scaled.
- Install a water softener if hardness is above 50 ppm calcium carbonate.
- Clean the brazed plate exchanger with 5% phosphoric acid, or 5% oxalic acid if cleaned often.
- Pump cleaning solution at a minimum of 1.5 times normal flow, preferably back-flushed.
- Rinse with clean water, then flush with 1-2% sodium hydroxide or sodium bicarbonate solution before a final rinse.
Applies to: DHW heat exchanger
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 40. Written in our own words; check the manual for your exact model.
Other
Everything else worth knowing at the appliance.
Annual service requirement
Boiler · C95 & C140 Combi
The boiler must be serviced and inspected by a qualified technician every year in normal residential use. Demanding or commercial use may need more frequent service.
- Schedule annual maintenance and inspection as described in section 14.2.
- Note that skipping the maintenance schedule voids the warranty.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 9. Written in our own words; check the manual for your exact model.
Anti-Legionella cycle
Boiler · C95 & C140
Only active in DHW Mode 1. The control checks at least once every 168 hours (7 days) that the unit reached maximum control temperature. If not, it fires and starts the pump to raise the temperature above control temperature. Display shows 'ALEg' with the DHW sensor temperature, and the faucet icon blinks while the demand is handled.
Applies to: C95 & C140 combi boilers in DHW Mode 1
Source: Glow Brand C95 & C140 manual, p. 65. Written in our own words; check the manual for your exact model.
Anti-legionella function behaviour
Boiler · Glow Combi C95 & C140
In DHW mode 1, anti-legionella can run if the tank does not reach 60°C / 140°F within 2 hours after first installation of a storage tank with sensor.
- Confirm the tank reaches 60°C / 140°F within 2 hours after first start-up.
- Use parameter 2.206 to enable or disable the function if needed.
Applies to: DHW mode 1, storage tank with sensor
Source: C95 & C140 Installation & Operation Manual, p. 62. Written in our own words; check the manual for your exact model.
Aquastat display reading in DHW mode 2
Boiler · Glow Combi C95 & C140
With an aquastat tank and a DHW call, the display shows 864.8°F (462.7°C). This is normal and comes from the aquastat resistance, which can vary slightly with brand.
Applies to: DHW mode 2 with storage tank aquastat
Source: C95 & C140 Installation & Operation Manual, p. 62. Written in our own words; check the manual for your exact model.
Before servicing the boiler
Boiler · C95 & C140
Basic precautions before any service work on the boiler.
- Disconnect or shut off all energy sources: 120VAC power, water and gas.
- Identify and mark wires before disconnecting them.
- Do not bypass electrical fuses or limit devices except briefly for testing.
- Wear proper PPE, including eye protection and safety footwear.
- Only qualified service personnel should carry out these procedures.
Applies to: C95 & C140 Glow Combi boilers
Source: C-300 C95-C140 Installation & Operation Manual, p. 72. Written in our own words; check the manual for your exact model.
Boiler location requirements
Boiler · C95 & C140 Combi
Install the boiler indoors in a dry location where the ambient temperature stays above freezing. Keep gas components away from dripping or spraying water.
- Choose an indoor, dry location kept above freezing.
- Protect gas components from dripping and spraying water.
- Check the location against system piping, gas and electrical supply, condensate drain, and vent termination.
- In an unheated area, keep the unit powered continuously so frost protection stays active.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 16. Written in our own words; check the manual for your exact model.
Clean the condensate trap after the first few months
Boiler · C95 & C140
New components leave deposits after the first condensate passage that can affect trap operation.
- After a few months of combi operation, clean the condensate trap to remove deposits and residue.
Applies to: Condensate trap maintenance
Source: Glow Brand C95 & C140 installation & operating manual, p. 31. Written in our own words; check the manual for your exact model.
Combustion air contamination sources
Boiler · C95, C140
Air containing these chemicals or dust will damage the heat exchanger and void the warranty. Pipe intake air directly to the outdoors where possible.
- Avoid installing near laundry facilities, dry cleaners, chemical fertilizer or pesticide areas, farms with livestock, woodworking or refinishing shops, auto body or metal shops, refrigerant repair shops, beauty shops, pool or hot tub areas, photo or plastics labs, and concrete or construction sites.
- Do not operate the boiler in an area under construction or renovation.
Applies to: Combustion air supply
Source: Glow Brand C95 & C140 installation & operating manual, p. 19-20, 24. Written in our own words; check the manual for your exact model.
Crystalline silica in the combustion chamber
Boiler · C95 & C140
Some components in the combustion chamber may contain crystalline silica, a potential carcinogen. Improper service can cause exposure. Handling instructions and protective equipment are in Section 14.
- Review the handling instructions in Section 14 before servicing the combustion chamber.
- Use the recommended personal protective equipment.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 4. Written in our own words; check the manual for your exact model.
Display symbols reference
Boiler · Glow Combi C95 & C140
Main screen icons shown on the LCD display.
- Radiator icon: CH enabled; blinks when handling CH demand.
- Faucet icon: DHW enabled; blinks when handling DHW demand.
- Wrench icon: blinks when service is required.
- Flame icon: burner is on and heating.
- No flame icon: unit cannot start, lockout or blocking error present.
- Frost icon: blinks when anti-frost protection is active.
- OTC icon: outdoor temperature compensation is active.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 54. Written in our own words; check the manual for your exact model.
Do not vent into a chimney or with other appliances
Boiler · C95, C140
Venting restrictions that apply to every installation.
- Do not vent into an existing chimney or chase unless the vent is run through a vacant chimney using approved material.
- Do not common-vent the boiler with any other gas appliance or vent stack.
- Pipe the exhaust and combustion air intake separately.
- Do not insulate PVC or CPVC vent in a conditioned space.
- Do not terminate the vent over public walkways, near soffit vents, crawl spaces, or where condensate could cause a hazard or damage.
Applies to: All venting installations
Source: Glow Brand C95 & C140 installation & operating manual, p. 18-19, 24. Written in our own words; check the manual for your exact model.
Domestic hot water scald protection
Boiler · C95 & C140
Water over 125°F/52°C can cause severe burns or death. Set the domestic hot water to the lowest temperature that meets user needs. 120°F/49°C is recommended to reduce scald risk. A tempering valve in the domestic hot water supply is recommended.
- Set the domestic hot water temperature to the lowest setting that meets the user's needs.
- Set 120°F/49°C or lower where possible to reduce scald risk.
- Install a tempering valve in the domestic hot water supply.
- Advise users that small children and disabled persons need supervision at hot taps and in bathtubs or showers.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 8. Written in our own words; check the manual for your exact model.
Domestic inlet screen
Boiler · Glow Combi
A combined flow restrictor and inlet screen sits in the domestic water chamber. It twists out for cleaning. Never run the boiler without it, since debris can cause poor operation or malfunction.
- Twist the grip to remove the restrictor and screen cartridge.
- Clean or inspect the screen.
- Reinstall the screen before operating the boiler.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 40. Written in our own words; check the manual for your exact model.
Error display types and blink rates
Boiler · C95 & C140
Lockout shows 'Loc' top-left, blocking error shows 'Err', warning shows 'AttE'; the specific code appears large on the right. Backlight blink rate: lockout every 0.5 s, blocking error every 1 s, warning every 1.5 s. Lockouts 1 and 2 are hard lockouts and need RESET pressed and held. Blocking errors clear only after the fault is fixed. Warnings clear by cycling power or pressing RESET. User and Installer menus stay accessible during all three.
- Press and hold RESET to clear a lockout.
- Fix the cause before expecting a blocking error to clear.
- Cycle power or press RESET to clear a warning.
Applies to: C95 & C140 combi boilers
Source: Glow Brand C95 & C140 manual, p. 66-69. Written in our own words; check the manual for your exact model.
Flue microfuse replacement
Boiler · C95 & C140
Flue microfuse on top right of primary heat exchanger opens above 336°F (169°C). If it opens, the primary heat exchanger must be replaced.
- Check the microfuse on the top right of the primary heat exchanger if an overheat event is suspected.
- If the microfuse is open, replace the primary heat exchanger.
Applies to: Primary heat exchanger
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 41. Written in our own words; check the manual for your exact model.
Hard water and domestic cleaning
Boiler · Glow Combi
Water harder than 50 ppm calcium carbonate needs a water softener before the appliance. Brazed plate heat exchangers can be cleaned with weak acid (5% phosphoric, or 5% oxalic if cleaned often), pumped at 1.5 times normal flow, preferably back-flushed. Rinse with clean water, then neutralize with a 1-2% sodium hydroxide or sodium bicarbonate solution before the final rinse.
- Install a water softener if hardness is above 50 ppm calcium carbonate.
- Clean the brazed plate with weak acid at about 1.5 times normal flow, preferably back-flushed.
- Rinse thoroughly with clean water.
- Neutralize with a 1-2% NaOH or NaHCO3 solution, then do a final rinse.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 40. Written in our own words; check the manual for your exact model.
Installer qualification and warranty
Boiler · C95 & C140
The boiler must be installed by a licensed, certified and trained heating technician. Otherwise the warranty is void.
- Confirm the installer is licensed, certified and trained before installing.
- Follow the manual and the authority having jurisdiction requirements.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 3. Written in our own words; check the manual for your exact model.
Massachusetts carbon monoxide and signage requirements
Boiler · C95 & C140
In Massachusetts, horizontally vented gas equipment in residential buildings with a side wall vent termination under 7 ft above grade needs a hard-wired CO detector with battery backup on each level and a required exhaust vent warning sign. The installer must be licensed under 248 CMR 2.00 and 5.00.
- Confirm a hard-wired CO detector with alarm and battery backup is installed on the appliance level and each additional level served.
- If the requirement cannot be met at completion, install a battery-operated CO alarm and complete the hard-wired installation within 30 days.
- Use NFPA 720 and ANSI/UL 2034 listed, IAS certified CO detectors.
- Mount a metal or plastic sign at least 8 ft above grade in line with the vent terminal, reading 'GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS' in letters at least 1/2 inch high.
Applies to: Massachusetts installs with side wall horizontal vent under 7 ft
Source: C95 & C140 Installation & Operation Manual, p. 5. Written in our own words; check the manual for your exact model.
Replace water-damaged components
Boiler · C95 & C140 Combi
Components damaged by water or flooding must be replaced immediately with new factory-approved parts. Failure to replace them can cause property damage, serious injury or death.
- Identify any water or flood-damaged components.
- Replace them with new factory-approved components before operating the unit.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 16. Written in our own words; check the manual for your exact model.
Scald hazard with DHW temperature
Boiler · C95 & C140
Hot water scald risk if the thermostatic mixing valve is missing or set too high. Code may require a 120°F or lower maximum setting.
- Install a thermostatic mixing valve where required.
- Set the mixing valve maximum to 120°F or lower if local code requires.
- Follow the mixing valve manufacturer's adjustment instructions.
Applies to: DHW distribution
Source: Glow Brand C95 & C140 Installation & Operation Manual, p. 40. Written in our own words; check the manual for your exact model.
Storing the boiler
Boiler · C95 & C140 Combi
Store the boiler horizontally and dry, with no more than three units stacked. Do not let the storage temperature fall below freezing.
- Store the unit horizontally in dry conditions.
- Stack no more than three units high.
- Keep storage temperature at or above 32°F/0°C.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 16. Written in our own words; check the manual for your exact model.
Unpacking and lifting onto the wall bracket
Boiler · C95 & C140 Combi
Unpack the boiler on the floor and lift it with two people onto the wall mounting bracket.
- Set the packed unit upright on the floor and open the four box flaps.
- Turn the box 180 degrees, supporting it from below, then lift the box off.
- Remove the foam packaging and lay the unit on its back away from the work area.
- Use two people to lift the boiler onto the wall bracket.
Applies to: C95 & C140
Source: Glow Brand C95 & C140 installation & operation manual, p. 16. Written in our own words; check the manual for your exact model.
Vent slope, support and terminations
Boiler · C95, C140
Slope and support rules for exhaust and air-inlet pipe, and termination heights and separations.
- Slope the exhaust vent up toward the termination at least 1/4 in per foot. Use 1/2 in per foot where condensate is heavy.
- Support horizontal and vertical vent and intake pipe at least every 5 ft or per local code.
- Keep the termination at least 12 in above grade or expected snow.
- Exhaust outlet must be 8 in to 24 in above the combustion air intake.
- Keep the horizontal distance between intake and exhaust at least 6 in center to center.
- Roof discharges must point away from the roof pitch and be at least 24 in apart.
- For vertical terminations through the roof, install a condensate tee with a trap on the vent before the unit.
- Wall thickness for direct vent terminations: minimum 1 in, maximum 50 in.
Applies to: Exhaust and intake venting
Source: Glow Brand C95 & C140 installation & operating manual, p. 22-24. Written in our own words; check the manual for your exact model.
Water flow must be present whenever the burner runs
Boiler · C95 & C140
The boiler must have water flowing through it whenever the burner is on. Running it without flow will damage the unit and void the warranty.
- Verify the pump and system flow are working before firing the burner.
- Do not allow the burner to run without water flow.
Applies to: C95 & C140
Source: C95 & C140 Installation & Operation Manual, p. 4. Written in our own words; check the manual for your exact model.
Related
Same tips in your pocket
The HVACopedia app has these tips, every error code and the settings tables offline.
For licensed technicians. Installer menus, test modes and access codes change settings that affect safety; only use them if you are trained on the appliance and understand the result. Gas, electrical and refrigerant work must be done by a qualified, licensed person, and the manufacturer’s manual for the exact model and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.